College of the North Atlantic Qatar (CNAQ)
   
CLIENT : College of the North Atlantic   Qatar
CONSULTANT : KEO
CONTRACTOR : ACONTEC
JOB : Package Integration with Various   System
SYSTEM : SATCHWELL - Micronet LON   System
YEAR : 2005
 
PROJECT DESCRIPTION
 
Central BMS System upgraded to TAC Vista Lon System and interconnected to a second pre commissioned package. Additional 554 VAVs were added in the system. The project included various systems integrated to a centralized sever such as Water Metering System,  Gas Monitoring System and BTU Meters. This server can be accessed in various locations inclusive of the main supervisor residence.

 

 

< Previous  |  Index  |  Next >